Moving a Story/Backlog Item to a Different Project
This feature is available in all editions.
Overview
Choose one of the following options to move a backlog item to another project.
When moving backlog items between teams or projects, all status values/rollup categories defined in the team process are cleared.
Option 1: Use Move to Project Button in the Grid
-
Go to the backlog grid and locate the items you want to move.
-
Click on the checkbox to select the backlog item.
-
Click the down arrow on the Move to Project button.
-
In the resulting pop-up, select the project you want to move these items to and then click Move.
Option 2: Change the Project on the Details Page
-
Open the Details view of a backlog item/story, and then click the Edit button.
-
Click the drop-down on the Project field, and then select a new project.
-
Click Save.
Option 3: Make the Project Field Editable in the Grid
-
On the backlog item grid, double-click the Project column. The Project field will now be editable on everything listed.
-
In each row, select a project from the drop-down list, and then click Save.