Adding a Story to a Sprint/Iteration on the Sprint Scheduling Page

This feature is available in Catalyst, Enterprise, and Ultimate editions.

editions-ceu.png

Overview

Follow these steps to learn how to add a story/backlog item to a sprint/iteration.

Steps

  1. Select Team > Iteration Planning (or Sprint Planning) > Iteration Scheduling (or Sprint Scheduling).

  2. Select a sprint/iteration on the left.

  3. Choose one of the following:

    • Select the Add Story Inline or Add Story, enter the required information, and then click Save.

    • Scroll to the Backlog grid at the bottom of the page, select an item, and then drag a story into the sprint grid at the top of the page.

      • To schedule multiple items, select the checkbox next to each item, and then click Move to Sprint. When the Sprint Assignment window opens, select a sprint, and then click Move.

Expand any sprint container to view the list of backlog within it. After an item has been scheduled, it is removed from the Backlog grid at the bottom of the page. If the Sprint schedule does not already exist, you can create one as described in Creating a New Sprint Schedule.

The Summer 2017 Release (17.2) introduced a new navigation menu structure. Refer to the Release Notes to learn more about all the changes.