Assigning Workitems to a Team on the Team Scheduling Page

This feature is available in Enterprise and Ultimate editions.

editions-eu.png

Overview

Follow these steps to assign (or schedule) backlog items to a team on the Team Scheduling page.

Steps

Simply drag-and-drop any backlog item directly to a team.  

  1. Select Release > Planning > Release Scheduling.

  2. If not already selected, select a project from the project navigator.

  3. Locate the desired project/release, and then click on the Teams tab.

  4. Select an item in the backlog grid on the right, and then drag it to a team on the left.

    •  You can can assign items to both a project/release and a team at same time

    • You an drag a portfolio item onto a team to assign the target team or to assign the team to any child items that exist.

If a portfolio item contains any child workitems that are assigned to other projects/releases, the system lists them and asks if you want move (or unite) them to the same project as the parent portfolio item:

  • Click Yes, unite these workitems to assign the workitems to the same project.

  • Click No, leave them there to leave them in their current project(s).