Test Trend Dashboard Panel

This feature is available in Ultimate edition only.

editions-u.png

The Analytics Test Trend dashboard panel allows you to understand how tests in the selected project/program are trending at configurable intervals.

Where to Find This Panel

The Test Trend panel is available on any of the following Analytics dashboards. See Adding a Panel to a Dashboard for instructions.

  • Portfolio > Executive Dashboard

  • Program > Product Owner Dashboard

  • Team > Dashboard

  • Team > Team Dashboard

  • Team > Quality Dashboard

  • Team > ScrumMaster Dashboard

Measures

  • The height of each bar on this chart indicates the number of tests, in the selected project or program, on a given date.

  • The Start date is determined by the panel Start Date parameter.

  • The number of days (bars), is determined by the duration size parameter.

  • The frequency between dates is determined by the duration unit panel parameter.

Configuring the Panel

  1. Click on the icon in the top right corner of the dashboard panel, and then click Edit.

  2. Choose from the panel parameters below.

Parameters for this panel may differ depending on the location of the dashboard.

Panel Parameter Descriptions

  • Portfolio Item: Shows work items in the selected portfolio item and all of it's children. The default option is "Blank" and shows all work items.
  • Team: Shows Team-specific data for the project or program. The default value is "All" or "Blank".
  • Sprint/Iteration: Shows data assigned to the sprint/iteration. The default value is "All".
  • Backlog Group: Shows work items in the selected backlog group. The default option is "All".
  • Backlog Goal/Objective: Shows work items assigned to the selected backlog goal. The default option is "All".
  • Workitem: Shows data for a specific work item type: All (all workitems), StoriesDefects, or Testsets. The default option is "All".
  • Start Date: The first date the report begins calculating data.
    • For project-based reports, the default start date is the project start date.

    • For sprint/iteration-based reports, the default start date is the sprint/iteration start date.

    • For member-based reports, the default start date is 13 weeks prior to the current date.

    • If the start date is set to the current date or later, no data displays.

  • Duration Size: The number of Duration Units until the project ends. If the project has an end date, the Duration Size defaults to the difference between the Start and End Dates in weeks. If the project has no End Date, the Duration Size defaults to the difference between the Start Date and the current date. Duration Size is set to 0 if the calculation results in a negative number.
  • Duration Units: Determines how a period is defined in terms of weeks (default) or months.